Contractor's Qualification Statement
The Undersigned certifies under oath the truth and correctness of all statements and of all answers to questions made hereinafter.
SUBMITTED TO:
SUBMITTED BY:
Howard-McKinney, Inc.
615 E. Houston
Tyler, Texas 75702
1. How many years has your organization been in business as
a subcontractor?
61 years
2. How many years has your organization been in business
under its present business name?
60 years
3. List corporate officers and charter information.
|
Date of incorporation: |
1972 |
|
State of incorporation: |
Texas |
|
President |
Mike Johnson |
|
Vice-President |
Chris L. Johnson |
|
Secretary |
Chris L. Johnson |
|
Treasurer |
Chris L. Johnson |
4. List states and categories in which your organization is
legally qualified to do business.
All 50
states. Products manufactured qualified for export.
5. We normally perform the following work with our own
forces:
|
Divisions |
6400 |
Architectural woodwork |
|
6200 |
Finish carpentry and millwork |
|
|
6410 |
Cabinet work (plastic laminate & wood) |
|
|
12302 |
Plastic laminate faced wood casework |
|
|
9900 |
Stain/paint finish of furnished woodwork |
6. Have you ever failed to complete any work awarded to
you?
No
7. Within the last five years, has any officer or partner
of your organization ever been an officer or partner of another organization
when it failed to complete a construction contract?
No
8 List major construction projects your organization has in process, giving the name of project, owner, architect, contract amount, percent complete, and scheduled completion date.
|
Rice University Houston, TX Linbeck Construction Contract Amount-$168,515 Completion Date-Summer 2006 |
Convention Center Hotel Shreveport, LA Walton Construction Contract Amount-$500,000 Completion Date-Sept 2006 |
SMU Embry Engineering Building Dallas, TX Turner Construction Contract Amount-$118,187 Completion Date-Fall 2006 |
|
Mother Francis Hospital Canton, TX Denson Construction Contract Amount $ 128,000 Completion Date Winter 2006 |
Herman Hospital Sugarland, TX Manhattan Construction Contract Amount $1,547,119 Completion Date Oct 2006 |
Sacred Heart Cathedral Houston, TX Linbeck Construction Contract Amount $ 444,311 Completion Date Oct 2007 |
|
5th Circuit Court White Construction Co. New Orleans, LA Contract Amount $ 57,529 Completion Date Dec 2006 |
UT Dormitories Tyler, TX SKANSKA USA Construction Contract Amount $ 266,000 May 2006 |
Mansfield Medical Center Mansfield, TX Centex Construction Contract Amount $ 1,547,000 Completion Date Nov 2006 |
9. List major projects your organization has completed, giving the name of project, architect, contract amount and date of completion.
| Bossier City Multi-Purpose Arena Bossier City, Louisiana Roy Anderson Construction AE Design Group Architect Contract amount $195,000 |
SMU Ford Stadium Ellerbe Becket Cons. Services CM |
Kyle Field End Zone Expansion 12th Man Luxury Suites College Station, Texas Bartlett Cocke Construction Contract amount $365,000 |
| University of Texas Stadium East 72 Luxury Skyboxes Austin, Texas Hensel Phelps Construction Contract amount $890,000 Completion date Aug 1998 |
Texas Ranger Stadium Manhattan Construction Contract amount $880,000 H.K.S. Architects |
Richardson Auditorium Richardson, TX Hunt Construction Company Contract Amount $ 1,208,454 Completed Summer 2002 |
| Casino Magic Pavilion Bossier City, Louisiana W.S. Bellows Construction Contract amount $166,000 Completion date June 1997 |
Isle of Capri Hotel & Pavillion Biloxi, Mississippi W.S. Bellows Construction Houston Kuhlmann Design, Architects Missouri Contract amount $550,000 Completed July 1995 |
Harrah's Riverboat Pavilion Shreveport, Louisiana Manhattan Construction Hnedak Bobo Group Architects Contract amount $143,000 Completion date April 1994 |
| Isle of Capri Riverboat Pavilion Shreveport, Louisiana Manhattan Construction Kuhlman Design Group Architects Completion date April 1994 |
|
Hermann Hospital SE Houston, TX Manhattan Construction Contract Amount $1,153,473 Completion Date Feb 2005 |
Hermann Hospital Women's & Pediatrics Center Houston, TX Spaw Maxwell Construction Contract Amount $ 288,000 Completion Date April 2005 |
Cooks Children's Hospital Imaging Fort Worth, TX Linbeck Construction Co. Contract Amount $ 70,363 Completion Date July 2005 |
|
East Texas Medical Center Athens, Texas RPR Construction Hammel, Green Architects Contract amount $225,000 |
Mother Francis Hospital Northeast Expansion Tyler, Texas Denson Construction Contract amount $354,000 |
Veterinary Referral Center Dallas Texas Manhattan Construction Ammend Group Contract amount $355,000 |
|
Hermann Hospital Houston, Texas Manhattan Construction Watkins, Carter, Hamilton Arch. Contract amount $3.2 Million Completion date June 1999 |
St. Michael's Hospital 6th Floor Completion Texarkana, Texas Manhattan Construction Watkins Carter Hamilton Architects Contract amount $440,000 Completion date Jan 1998 |
VA Hospital Muskogee, OK Manhattan Construction Murray, Jones, Murray Architects Contract amount $217,000 Completion date Dec 1997 |
|
East Texas Medical Center 8 & 9 Finish
Out Tyler, Texas Ellerbe Becket Construction Contract amount $115,000 Completion date March 1997 |
Providence Hospital Waco, Texas Ellerbe Becket Construction Contract amount $460,000 Completion date August 1997 |
Bed Replacement Building V.A. Hospital Temple, Texas Hyman Construction Polkinghorn Cline Partnership, Architects Contract amount $1,035,704 Completion date December 1997 |
|
Replacement Hospital V.A. Dallas Dallas, Texas Centex Bateson/ISEC Contract amount $328,758 Completion date January 1998 |
W.K. Bossier Medical Office Building Shreveport, Louisiana Estopinal Group Contract amount $318,000 Completion date June 1996 |
Texarkana St. Michael's P.O.B. Tenant Manhattan Construction Contract amount $510,000 Completion date July 1996 |
|
East Texas Medical Center West Campus Tyler, Texas Ellerbe Becket Construction Ellerbe Becket Construction Services, Architects Contract amount $910,000 Completion date August 1996 |
Arlington Memorial Hospital Arlington, Texas Manhattan Construction Wharton Lam Architects Contract amount $225,000 Completion date May 1996 |
All Saints Episcopal Hospital Fort Worth, Texas Walker/Turner Construction Contract amount $170,000 Completion date December 1996 |
|
Medical City, Dallas Building "D" Centex Bateson Construction Page-Southerland-Page Architects Contract amount $505,000 Completion date summer 1995 |
550 Bed Psychiatric Hospital Texas Department of Corrections Lubbock, Texas Lee Lewis Construction Hellmuth, Obata & Kassabaum, Inc. Architects Contract amount $338,000 Completion date May 1995 |
VA Ambulatory Care Facility El Paso, Texas Centex Bateson Construction Wingler & Sharp Architects Contract amount $202,000 Completion date June 1995 |
|
Indianapolis VA Hospital J.W. Bateson Construction Contract amount $200,000 |
Presbyterian Special Care Center Ft. Worth, Texas Thos. S. Byrne, Inc. Contract amount $245,000 Page Sutherland-Page Completion date August 1993 |
Sierra Medical Center El Paso, Texas Manhattan Construction Contract amount $249,000 Reese Associates, Architects |
|
Irving Hospital Projects Irving, Texas H.C.B. Contractors Contract amount $328,000 Page-Southerland-Page Architects |
V.A. Hospital Los Angeles, California J.W. Bateson Co. Contract amount $150,000 |
The Forum Retirement Center Dallas, Texas Parker/Croston Partnership Architects Manhattan Construction Co. Contract amount $515,000 |
|
Baptist Medical Center East Tower Oklahoma City, Oklahoma Frankfurt-Short-Bruza Associates Architects Manhattan Construction Co. Contract amount $670,000 |
Dallas Rehabilitation Institute National Medical Enterprises Harwood K. Smith Architect Stolte Construction Contract amount $325,000 |
Mother Frances Hospital Tyler, Texas Polkinghorn, Chapman, Cline, Guy architects Turner Construction Contract amount $450,000 |
|
St. Luke's Medical Center Houston, TX Linebeck Construction Contract Amount $ 1,405,966 Completion Date March 2003 |
V.A. Hospital Houston, Texas J.W. Bateson Co. Contract amount $1,116,000 Completion date December 1990 |
Montrue in the Woods Retirement Center Tulsa, OK Manhattan Construction Co. Contract Amount $ 162,000 Completion Date Winter 2003 |
|
Spine and Joint Hospital Tyler, TX Faulkner Construction Contract Amount $ 616,087 Completion Date Fall 2003 |
Good Shepherd Hospital
New Bed Tower |
Children's Medical Center Dallas, TX Centex Construction Company Contract Amount $ 1,350,830 Completion Date Fall 2003 |
|
Mother Francis Hospital Northeast
Expansion Completion Date August 2003 |
Trinity Medical Center Carrollton, TX Hunt Construction Company Contract Amount $ 1,102,510
|
East Texas Medical Center ER Addition/Renovation Tyler, TX Vaughn Construction Contract Amount-$71,694 |
|
UT Southwest Medical Center Dallas, TX Austin Commercial Construction Contract Amount-$100,000 Completion Date - Dec 2005 |
|
Southern Methodist University-Dedman Center Dallas, TX Austin Commercial Contact Amount-$588,000 Completion Date-March 2006 |
UT Engineering Science Building Tyler, TX SKANSKA USA Construction Contract Amount $ 229,942 Completion Date Feb. 2006 |
SMU Executive Education Conference Center Dallas, TX Centex Construction Contract Amount $ 740,615 Completion Date May 2005 |
|
Caldwell School Renovation Tyler, Texas RPR Construction Sinclair and Wright Architects Contract Amount $118,000 |
E99 Magnet School Richardson, Texas Dal-Mac Construction Hidell Architects Contract amount $160,470 |
Burleson High School Burleson, Texas Huckabee & Associates Contract amount $422,000 Completion date July 1997 |
|
Tarrant County Junior College, Southeast
Campus Forth Worth, Texas Thos. S. Byrne Construction Contract amount $409,000 Vestal Loftis, Architect Completion date December 1996 |
University Center at Tulsa Manhattan Construction H.T.B. Architects Contract amount $194,000 Completion fall 1995 |
UT Research Building Dallas, Texas Dal-Mac Construction Contract amount $230,000 Completion date June 1993 |
|
Texas A&M Headquarters Building College Station, Texas Paul Pogue, Inc. Contract amount $346,000 |
University of Texas San Antonio Downtown
Campus Centex Construction Contract Amount $270,000 Completion Date Spring 2001 |
Davis Gideon Mansfield Texas ISD Ratcliff Construction BRW Architects Contract Amount $ 276,000 Completion Date Summer 2002 |
|
Texas A&M University Center College Station, Texas B.F.W. Construction Contract amount $329,000 |
Pioneer school Arlington, Texas Satterfield and Pontike Cons. Contract amount $399,000 Completed Summer 2001 |
Mescalero School Riodoso, NM Centex Construction Company Contract Amount $ 430,000 Completed Summer 2002 |
|
SMU Electrical Engineering Austin, TX Manhattan Construction Contract Amount $ 213,869 Completed Summer 2002 |
Weatherford High School Weatherford, TX Charter Builders Contract Amount $ 847,670 Completion Date Sept. 2002 |
University of Texas at Austin Geological Science Building Silverton Construction Contract Amount $ 324,594 Completion Date August 2002 |
| Police Substation Dallas, Texas Manhattan Construction Contract amount $72,000 |
Denton County Courthouse Denton, Texas Huber Hunt and Nichols Contract amount $232,000 |
Denton County Law Enforcement Building Denton, Texas Huber Hunt and Nichols Cons. Contract amount $168,635 Completion Date Spring 2001 |
|
Senior Center Round Rock, TX Snider Construction Contract Amount-$103,860 Completion Date-Spring 2005 |
Citicorp Regents Site Irving, TX Contract Amount-$675,00 Completion Date-Nov 2005 |
Citicorp Las Colinas
Site Irving, TX Contract Amount-$275,00 Completion Date-Oct 2005 |
|
NEC Headquarters Irving, Texas Manhattan Construction Contract amount $110,000 |
M.D. Anderson Faculty Center Houston, Texas Hensel Phelps Construction Watkins Hamelton Ross Architects Contract amount $240,000 |
World-Com Corporate Headquarters San Antonio, Texas Manhattan Construction The Amend Group Contract amount $145,000 Completion date Aug 1998 |
|
WFAA TV Channel 8 Dallas, Texas HCB Contractors Contract amount $230,000 Completion date Sept 1997 |
Fed Ex Southwest Hub Alliance Airport, Texas Austin Commercial Contract amount $110,000 Completion date May 1997 |
Central Southwest Services Dallas, Texas H.C.B. Contractors Corgan Associates Architects Contract amount $365,000 Completion date August 1993 |
|
ORYX Energy Co. World Headquarters Dallas, Texas Austin Commercial Contract amount $479,110 H.O.K Architect |
Beauty-Control Cosmetics Addison, Texas Spring Valley Construction Contract amount $420,000 Completion date January 1991 |
Western Currency Facility Bureau of Engraving Fort Worth, TX Haws & Tingle Contract Amount $80,351 Completion Date Spring 2003 |
|
Proton Therapy Clinic Linbeck Construction Co. Houston, TX Contract Amount $ 400,000 Completion Date July 2005 |
6 D Ranch
Austin, TX White Construction Contract Amount $ 710,000 Completion Date Nov 2004 |
| Marvin United Methodist Church Tyler, Texas RPR Construction SDT Architects Contract amount $155,000 |
Prestonwood Baptist Church Plano, Texas Manhattan Construction HH Architects Contract amount $550,000 Completion date July 1999 |
| Westin Hotel Frisco, Texas Roy Anderson Construction Aguirre Corp. Architects Contract amount $1,100,000 |
Doubletree Hotel Plano, Texas Manhattan Construction HKS Architect, Dallas Contract amount $500,000 |
Four Seasons Hotel Ballroom Las Calinas, Texas Manhattan Construction HKS Architects Contract amount $384,000 |
| Moody Gardens Hotel (400 rooms) Galveston, Texas Gilbane Construction Morris Architects Contract amount $560,000 Completion date Jan 1999 |
Isle of Capri Hotel & Pavillion Biloxi, Mississippi W.S. Bellows Construction Houston Kuhlmann Design, Architects Missouri Contract amount $550,000 Completed July 1995 |
Four Seasons Resort Villas Las Calinas, Texas Manhattan Construction Architect -- H.K.S. Dallas Contract amount $500,000 Completion date April 1994 |
| Moody Gardens, Phase III Galveston, Texas Gilbane Building Co. Contract amount $335,000 Morris Architects/Houston |
United States Postal Training Facility Norman, Oklahoma J.W. Bateson Co. Contract amount $735,000 Glover Smith Bode Architects |
Doubletree Hotel Dallas, Texas Dallas-LBJ Hotel Ltd. Partnership H.M.B.H. Architects, Dallas Dal-Mac Construction, G.C., Dallas Contract amount $562,000 |
| Gallaria Hotel Dallas, Texas Gerald D. Hines Interest J.A. Jones Construction Contract amount $950,000 |
Veterans Administration Domicilliary Building Olen E. Tieges Veterans Ctr. Temple, Texas U.S. Government, Owner Pfluger Associates, Architects Stolte, Inc. G.C. Contract amount $100,000 |
Kimpton Hotel-Tariff Building Washington, DC J.A. Jones/Tompkins Builders Contract Amount $ 464,000 Completed Summer 2002 |
| Alberti 2000 Bed Prison Unit Tennessee Colony, Texas Contract amount $110,000 Contractor -- Austin Commercial, Dallas Architect -- H.O.K., Dallas |
Tarrant County Jail Facility Ft. Worth, Texas Tarrant County, Owner Parker/Croston Partnership Architects Robert E. McKee Construction Contract amount $490,341 |
| Dallas Museum of Fine Arts J.W. Bateson Co. Contract amount $380,000 Completion date July 1993 |
Waco History Museum Baylor University BFW Construction Contract Amount $ 503,846 Completion Date June 2003 |
| DFW Terminal 4 E Renovation Manhattan Construction Contract amount $218,000 DAHL Braden Architects |
Terminal 4 E DFW International Airport Dallas/Ft. Worth, Texas Pierce, Goodwin, Alexander Architects Manhatton Construction Contract amount $270,000 |
DFW Terminal D Grand Hyatt Hotel DFW Airport, TX Austin Commercial Contract amount $ 2,419,086 |
| Stonebridge Ranch Country Club McKinney, Texas Republic Bank Group, owner Paul Jones, Architect Spring Valley Construction, Dallas Contract amount $240,000 |
Ridglea Country Club Fort Worth, Texas JBM Builders DMS Architects Contract Amount $200,000
|
10. List the construction experience of the key individuals of your organization
(1) Mike Johnson: Project coordinator for twenty-five
years. An average a $2,000,000 manufacturing and installation
coordination annually.
(2) Chris Johnson: Same for twenty-three years. Also an
average of $2,000,000 manufacturing coordination and installation annually.
Further, gross sales annually are
as follows:
|
Year |
Gross Revenues |
Year |
Gross Revenues |
Year |
Gross Revenues |
|
1980 |
$1,300,000 |
1990 |
$3,177,000 |
2000 |
$4,318,000 |
|
1981 |
$1,800,000 |
1991 |
$2,800,000 |
2001 |
$4,014,341 |
|
1982 |
$2,150,000 |
1992 |
$2,250,000 |
2002 |
$4,777,195 |
|
1983 |
$2,240,000 |
1993 |
$2,900,000 |
2003 |
$5,536,061 |
|
1984 |
$2,400,000 |
1994 |
$3,200,000 |
2004 |
$4,486,479 |
|
1985 |
$2,400,000 |
1995 |
$4,200,000 |
2005 |
$4,505,141 |
|
1986 |
$2,270,000 |
1996 |
$3,054,000 |
||
|
1987 |
$2,400,000 |
1997 |
$4,100,000 |
||
|
1988 |
$2,100,000 |
1998 |
$3,800,000 |
||
|
1989 |
$2,400,000 |
1999 |
$4,760,000 |
Currently overseeing fifty (50) employees
11. Trade References
| Name | Telephone | Fax |
|
Central Hardwoods, Inc. |
800.460.2030 | 972.484.8228 |
|
Formica Corporation. |
800.745.8677 | 800.743.3299 |
|
Louis and Company |
800.444.0043 |
800.944.7494 |
|
Hogan Hardwoods |
972.602.1777 | 972.602.0224 |
|
WilsonArt Corporation. |
214.634.2310 |
214.634.1435 |
12. Bank References
Southside Bank
Mr. William Hartley, President
1201 S. Beckham
Tyler, Texas 75701
(903)
531-7111
13. Name and address of bonding company.
Merchants
Bonding Co.
6000 N.
Lamar, Suite 200
Austin,
Texas 78752-4497
Name,
address and telephone number of agent.
Mr. Todd Threlkeld
Threlkeld & Company
P.O. Box 7820
Tyler,
Texas 75711
(903) 581-0077
14. Attach a financial statement.
Upon request.
Name of Organization:
Howard-McKinney, Inc.
615 E. Houston Street
Tyler, Texas 75702
By: Chris Johnson
Title: Vice President
Mr. Chris Johnson being duly sworn deposes and says that he is the Vice-President of Howard-McKinney, Inc. and that answers to the foregoing questions and all statements contained are true and correct.
Subscribed and sworn before me this ____ day of ___________, _____.
State of Texas
County of Smith
Notary Public:___________________________
My Commission Expires:___________________